Rite Aid

Capo Beach, CA

Entry Title

  • VCT and LVT installed over part Terrazzo and concrete.
  • ASTM 2170 Insitu RH >95%
Entry Title

  • Gondolas jacked out of the way and floor scraped with a Terminator machine
Entry Title

  • 780 Diamatic, 3 head grinder (220v) with vacuum attachment over terrazzo and concrete.
Entry Title

  • Section is set initially in wet adhesive in a Walk-Off-Work method
  • After 20-25 min flash then rolled with 100lb roller
  • This section of flooring is going over terrazzo tile
Entry Title

  • 6 Months Later
Entry Title

  • The installation occurred at night without disruption to daylight retail activity. This saved Rite-Aid $1,000's in lost revenue and wages.